Our team attended a Wooloowin property to resolve a broken sewer line identified via CCTV and locating equipment.
The Problem: Diagnostic tools pinpointed a specific failure point in the underground sewer line.
The Solution: We used our micro excavator to expose the broken pipe section with precision.
The Outcome: Our operators installed a new 100mm PVC section to restore the house drainage system.
Equipment & Efficiency
Tight-access capabilities allowed us to reach the repair site without property damage. Our operators originate from a plumbing background, ensuring all excavation around the existing sewer line remained safe and controlled.
1-Tonne Micro Excavator: Navigated narrow access to reach the repair zone.
6-Tonne Tipper: Removed spoil and imported clean fill for site reinstatement.
Specialised Skill: We provide wet hire only, ensuring an experienced operator manages the risk of working around live services.
Hire Getta Digger
Need tight-access or confined space plumbing excavation in Brisbane?